Line Painting
Line Striping
“Top notch service.”
Brian Norris google Review
Asphalt Line Painting FAQs
-
How soon can striping be painted on a newly seal coated lot?
-
If curing additives are used in the sealer, parking lot striping can be done on the same day.
-
Do you provide line painting services for both new layouts and existing ones
-
Yes. We will restripe based on an existing layout, or we can work with you to create a new layout and add additional spaces, ADA spaces, reserved, traffic signage, and more.
-
Do you offer reflective paint options for increased visibility at night?
-
Yes, we have reflective paint options that increase visibility for night traffic.
-
Can we schedule line painting services during our off-peak hours to minimize disruption to our business?
-
Yes. We will work with you to minimize disruption as much as possible.
-
On average, how long does it take to complete a commercial line painting service?
-
The biggest factors determining how long a commercial line painting service will take are size and complexity. When we provide you with a free estimate, we will also be able to provide you with an anticipated project timeline.
-
How long will the line stripes last?
-
While we stand by the quality and expertise of our work, overall durability depends on traffic, erosion, drainage, and sun exposure throughout the year.
-
When can people walk or drive on the asphalt surface after line painting has been applied?
-
New parking lot lines are typically dry and ready to be walked or driven on 30 minutes after their application.
-
Can you customize line markings to suit our business requirements?
-
Yes. We are happy to adjust to your needs whenever possible.
-
How much do asphalt line painting services cost?
-
The cost depends on the size, layout, number of spaces, and additional requests like numbers, letters, ADA spaces, and more. Request a free estimate today for the most accurate price estimate for your parking lot line needs.